The 5th wave of demolition of samostroy in Moscow has already formed a list of objects that will be demolished. At the end of the summer of 2019, the government published a complete list of objects with exact addresses that should be dismantled by their owners.

This program has been operating in the capital since the end of 2015, when the first addresses of construction sites to be demolished were approved. In the winter of 2016, the first authorized demolition of illegally constructed buildings took place.

In the 5th wave, it is planned to demolish about 43 thousand square meters. These objects are included in this program on the basis that they are located on land plots with a special regime for their use. Or these buildings are located on important engineering communications of the city. They carry the threat of creating an emergency, and therefore must be dismantled.

The Moscow City Hall in 2019 offers compensation to the owners of such buildings for voluntary dismantling. The payment amount is calculated at the rate of 55.5 thousand rubles for each sq.m. demolished premises.

If the object is demolished voluntarily with the help of state bodies assisting in dismantling, the owner has the right to receive compensation in the amount of 51 thousand rubles for each square meter.

Demolition history

Currently, the owners of samostroy, recognized by the government of the city of Moscow as necessary for demolition, voluntarily agree to dismantling.

The first involuntary demolition organized by the government of the capital took place at night in February 2016. Then, more than 700 pieces of equipment drove onto the streets of the golden-domed, and more than 100 objects were demolished.

That night, many cafes and trade pavilions familiar to the residents of the capital were dismantled. This event was remembered by many residents. Basically, superstructures and pavilions near the entrances to metro stations were dismantled.

The second wave was also organized at night in the summer of 2016. During this period, 107 retail spaces were demolished. The work was mainly carried out in the central part of the capital, as well as in the southern and eastern districts.

In December of the same year, the third wave of demolition was organized. The list was published 2 months before the night when 43 buildings were to be demolished. But this time, such a demolition did not work out, since almost 90% of the owners of these buildings decided to voluntarily dismantle their buildings and receive the due compensation for them. At that time, a spontaneous market was cleared near the Petrovsko-Razumovskaya metro station. Residents of that quarter appreciated the actions of the mayor's office, as there was a constant accumulation of criminal elements and illegal migrants.

After an almost voluntary dismantling at the end of 2016, a new fourth wave list was published. It contained 54 buildings mainly located in:

  • Northern;
  • Northeast;
  • South;
  • Southwestern regions.

This list then included many catering facilities, as well as shopping centers.

The largest object, with an area of ​​more than 3,500 square meters, then turned out to be a shopping center on Kronstadt Boulevard. Then its owners agreed to the dismantling with the participation of the city prefecture and received compensation.

About 75% of the fourth wave was demolished voluntarily, and the rest of the buildings were destroyed in the winter of 2017. And at the end of the summer of 2017, the fifth wave was published, which included fairly well-known construction projects.

Fifth wave addresses

In the Central District of Moscow, the following addresses are subject to demolition:

  1. st. Kalanchevskaya 11 k.1.
  2. Kaluga square 1 building 3.
  3. Novy Arbat 8, building 2, 24 building 2.
  4. Petrovka 34 building 7.
  5. st. Sadovo-Samotechnaya 20 building 1.
  6. Per. Krasin 16, p.10.
  7. st. Krasnaya Presnya 25, building 2.
  8. st. Baumanskaya 44, building 2.

The Western District will get off the easiest way - with one building at 9A Bolshaya Dorogomilovskaya Street.

In the Northern District, it is planned to dismantle 5 buildings at the following addresses:

  1. st. Dubninskaya 38A, building 2.
  2. st. Ketcherskaya 15 A.
  3. st. Kuusinen 1, building 1.
  4. st. Khoroshevskoe highway 39, building 26.
  5. Dmitrovskoe highway 77, building 1.

In the North-Western region, the main blow to the cleanup will be on Stratonavtov 8A passage, where buildings 1 to 8 will be demolished. In addition, the fifth wave will affect buildings at the following addresses:

  1. Prospect Zhukov 25, building 1.
  2. st. Nelidovskaya 13, building 1.
  3. Rainis boulevard 2.

Demolition of the following buildings in the North-Eastern District is planned:

  1. Altufevskoe highway 36A.
  2. st. Bochkova 3A.
  3. Travel Hotel 7G and 9A.
  4. Proezd Dezhnev 23D.
  5. st. Babushkina 28, pp. 1,2.

In the South-Western District, buildings 2 to 8 will be demolished along Vlasova Street 4. And in the South-Eastern District, 24 buildings will be demolished. First of all, buildings from 4 to 9 along Novoostapovskaya street 1, from 1 to 4 buildings along Ryazansky avenue 40, building 2 are subject to demolition. Free-standing structures at the following addresses will also fall under the scrap:

  1. st. Lublinskaya 96, building 1 and 2.
  2. st. Khlobystova 17, 26 building 2.
  3. Projected passage 5369 Kapotnya str.1.
  4. Kashirsky proezd 10.
  5. st. Velozavodskaya 26.
  6. st. Zelenodolskaya 40, building 2.
  7. st. Shkuleva str. 2D, str. 2B.
  8. st. Novokuzminskaya 19A.
  9. Nut Boulevard 15G, 7, bldg. 1A,
  10. st. Caspian 13, 13 building 1.

In the Southern District, demolition will also continue along Kaspiyskaya vl. 36 Zh and 36A, on Orekhovy Boulevard vl. 24, bldg. 2,3 and 47/33A. Buildings on Kashirsky proezd vl. 10, bldg. 5 and 11, as well as on Kashirskoe shosse vl.106B. Buildings will also be dismantled at:

  1. Simferopol Boulevard 11.
  2. Proletarsky prospect 23B.
  3. st. Voronezhskaya 15.
Thus, we can conclude that this time all districts of the city of Moscow are included. For about six months, the government has been identifying the location of buildings that do not meet safe urban planning standards.

Lawsuits

The cost of many demolished buildings is very high, and the compensation funds allocated by the government sometimes cannot compensate even half of the damage suffered by the owner of the demolished object.

After the first wave, when the owners did not believe that the government of the city of Moscow would go to extreme measures, many owners of the demolished buildings filed a claim with Supreme Court. The court was on the side of the government.

The owners were unable to produce building permits for the premises in these areas. After that, the owners turned to other authorities. But the result was the same everywhere. That is why during the third and subsequent waves, many owners agreed to dismantle their squatters on their own.

According to the authorities, all vacated land plots are not subject to new development and will be landscaped in the form of lawns and park areas.

In the last decade, the Moscow government has paid great attention the external appearance of the city and conducts significant cleaning of emergency buildings and residential buildings.

Recall that in December 2015, the Moscow government adopted a resolution on the demolition of 104 dangerous unauthorized buildings located in different parts of the city.

List of addresses that fell under the 5th wave of demolition of unauthorized construction in Moscow in 2018

For 97 objects, the time allotted for independent dismantling expired on February 8, 2016, after which the authorities independently began demolition.

Then none of the owners agreed to the voluntary demolition. The owners of commercial buildings claimed that they had all the documents and accused the authorities of arbitrariness. Moscow Mayor Sergei Sobyanin called the demolition of trade stalls "a clear example of the fact that truth, heritage, the history of our country are not sold in Russia," and said that one should not "hide behind papers about property acquired in a clearly fraudulent way."

Assessment of a building or other property for demolition

Compensation for the forced demolition of a building with a 150% benefit?

When a building is demolished, the owner rarely receives at least his 100% of the market value as compensation at the first bid. Otherwise appraisal companies would be left without work in this segment. And there is work in this segment.

Independent assessment - protecting your interests

It has already been said that compensation is due to the own building subject to "forced" demolition. This demolition compensation can be defined as a building valuation, for example.

A complete list of objects recognized as self-construction and subject to demolition in Moscow has been published

But such compensation does not take into account the lost profit of the owner, if he created a business on the basis of this property. How to be in this case?

If the owner of the building for demolition built a business on its basis, then the lost profit will be taken into account when assessing the business. And in this case, the amount of compensation may be 150% or more of the initial declared amount of compensation.

You can contact our specialists and learn more about how to protect your interests in the event of a building or other property being demolished.

Documents required for assessment during the demolition of a building

    Data on the legal status of the object (certificate of registration, title, property rights), including the exact address of the location of the object of appraisal

    Information about the presence of real estate encumbrances, including encumbrances of collateral or debt obligations, the presence of tenants, legal clauses, agreements, contracts, treaties, special tax assessments and other restrictions on the use of real estate

    Data on the physical boundaries of the object (copies of a geodetic plan or map with the designation and description of the location of the property)

    Accounting certificate of the book value of the building (if the owner of the building is a legal entity).

    Data on the state of the land plot, including documents confirming the rights to the land plot (ownership, lease, etc.)

    Data on property that is not immovable, but subject to valuation as part of the latter

    BTI technical passport for the building (Floor plan and explication)

    Other technical documentation for the facility (design and estimate documentation for construction, reconstruction; explanatory notes, as well as other documents related to the property and necessary for the appraiser).

Regulatory information

An independent appraisal is carried out in accordance with Federal Law N135 "On appraisal activities" and the Federal Appraisal Standards. The report drawn up in accordance with all norms has full legal force and can be used in court or other instance.

After the appraisal work, the results are agreed upon and the final cost of the appraisal object for demolition is displayed, which is indicated in the final report and can be used by the customer as an amount of compensation in favor of the owner in the process of liquidating the appraisal object.

A list of 27 illegally built or reconstructed "buildings, structures, extensions and superstructures that are subject to dismantling by court decision" is published on the department's page in the "Activities" section, "Unauthorized construction" subsection.

"According to court decisions, the owners of illegal buildings are required to take measures to dismantle illegal buildings and vacate land," the message says.

The department reminds that if the illegal building is not dismantled voluntarily, then it will be forcibly removed by the forces of the prefecture with the assistance of the State Budgetary Institution " Car roads" of the respective county. The costs associated with the dismantling will be charged to the owner of the unauthorized construction.

Recall that in December 2015, the Moscow government adopted a resolution on the demolition of 104 dangerous unauthorized buildings located in different parts of the city. For 97 objects, the time allotted for independent dismantling expired on February 8, 2016, after which the authorities independently began demolition.

Then none of the owners agreed to the voluntary demolition. The owners of commercial buildings claimed that they had all the documents and accused the authorities of arbitrariness.

List of objects to be demolished

Moscow Mayor Sergei Sobyanin called the demolition of trade stalls "a clear example of the fact that truth, heritage, the history of our country are not sold in Russia," and said that one should not "hide behind papers about property acquired in a clearly fraudulent way."

At the end of April 2016, the Supreme Court finally recognized as lawful the decision of the Moscow government "On measures to ensure the demolition of unauthorized buildings in certain areas of Moscow", refusing to satisfy several applicants for their complaints about being entered into the register of unauthorized construction.

On September 9, 2016, the Arbitration Court of the capital rejected the claim of the owner of one of the demolished facilities near the Yuzhnaya metro station for the recovery of damages in the amount of 1.806 billion rubles from the Moscow government, the prefecture of the Southern Administrative District and the State Budgetary Institution Automotive Roads of the South Administrative District. This decision was later upheld by higher courts.

At the end of June, the Moscow authorities published a new list of unauthorized construction for demolition, which included 107 buildings with a total area of ​​31,000 sq.m. The "second wave" of the demolition of the squatter took place at the end of August, with most of the owners agreeing to dismantle illegal objects on their own. At the beginning of October, 43 objects with a total area of ​​26.7 thousand square meters were included in the "third wave".

In February 2017, the fourth stage of the demolition of the squatter building was completed, which included 54 objects. The "fifth wave" of dismantling in August last year included 78 facilities with a total area of ​​42.3 thousand square meters.

Starting with the "second wave", volunteers who have decided to dismantle the facility on their own or have declared their consent to dismantling with the assistance of the city are eligible for compensation. Payments for demolition by the owner amount to 55.5 thousand rubles per square meter of real estate. If the owner turned to the city for assistance, compensation will amount to 51 thousand rubles per sq.m. The period allotted for voluntary dismantling is calculated taking into account the height of the unauthorized building and the area of ​​the occupied site.

In general, in less than four years, almost 4 thousand unauthorized buildings with a total area of ​​​​about 1.3 million square meters were demolished in the capital. According to Sergei Shogurov, the head of the state inspection for monitoring the use of real estate in Moscow, the authorities are not planning to arrange new waves of demolition.

In October last year, he also noted that as part of the planned work with the owners of squatters in the capital, there are 200-300 trials.

In August 2018, Russian President Vladimir Putin signed a law regulating the rules for the demolition of unauthorized construction sites and protecting the rights of bona fide building owners. The document clarifies the concept of "unauthorized construction". In particular, he determines that a building can be recognized as unauthorized only if the requirements established at the time of the beginning of its creation and in force at the time of detection of unauthorized construction are violated.

http://realty.interfax.ru/ru/news/articles/97746/

Administrative procedure for the demolition of unauthorized buildings

Explains the Deputy Head of the Department for Ensuring the Participation of Prosecutors in the Civil and Arbitration Proceedings of the Moscow Prosecutor's Office Vitaly Sergeevich Miroshnichenko

According to paragraph 1 of Article 222 of the Civil Code Russian Federation(hereinafter - the Civil Code of the Russian Federation) an unauthorized construction is a building, structure or other structure erected, created on a land plot not provided in the prescribed manner, or on a land plot, the permitted use of which does not allow the construction of this facility on it, or erected, created without obtaining the necessary permits for this or in violation of urban planning and building codes and regulations.

A person who has carried out an unauthorized construction shall not acquire the right of ownership to it, and the construction itself shall be subject to demolition.

Until September 01, 2015, the forced demolition of an unauthorized building could be carried out only on the basis of a court decision.

Federal Law No. 258-FZ of July 13, 2015 amended Article 222 of the Civil Code of the Russian Federation and the Federal Law “On Enactment of Part One of the Civil Code of the Russian Federation”. The changes that came into effect on September 01, 2015 give the authorities local government city ​​district with the authority to make a decision on the demolition of an unauthorized building out of court.

According to paragraph 4 of Article 222 of the Civil Code of the Russian Federation, local self-government bodies have the right to make such a decision in the event of the creation or construction of an unauthorized structure on a land plot that has not been provided in the prescribed manner for these purposes, if this land plot is located:

  • in a zone with special conditions for the use of territories (with the exception of the zone of protection of cultural heritage objects (monuments of history and culture) of the peoples of the Russian Federation);
  • in the common area;
  • in the right of way of engineering networks of federal, regional or local significance.

Thus, the range of cases where a decision on demolition can be made administratively is limited to a certain list of types of land plots on which an unauthorized building has been erected.

Complex of urban planning policy and construction of the city of Moscow

At the same time, within seven days from the date of the decision to demolish the unauthorized structure, the local government body that made such a decision is obliged to send a copy of this decision to the person who carried out the unauthorized structure, which indicates the period for demolition of the unauthorized structure (established taking into account the nature of the unauthorized structure, but cannot be more than 12 months). It is important that the period for the demolition of an unauthorized structure should be determined depending on its nature.

Special rules are established in paragraph 4 of Article 222 of the Civil Code of the Russian Federation for cases where the person who erected the unauthorized structure is unknown. For such cases, the legislator establishes a special procedure for informing about the decision by the relevant authority to demolish an unauthorized building and provides for a period during which the building cannot be demolished.

If the person who carried out the unauthorized construction has not been identified, then the demolition of the unauthorized construction may be organized by the body that made the relevant decision not earlier than two months after the date of posting on the official website of the authorized local government body in the Internet information and telecommunication network a message about the planned demolition of such a building.

I would like to separately draw attention to the fact that under "territories of common use" in accordance with paragraph 12 of Article 1 of the Town Planning Code of the Russian Federation, we mean territories that are freely used by an unlimited number of persons (including squares, streets, driveways, embankments, coastal strips of public water bodies, squares, boulevards).

Return to list

officials

Fifth wave: Moscow mayor's office approved a new list of unauthorized construction for demolition

78 illegal properties will be dismantled, including a popular English pub and a Thai cafe on Novy Arbat.

The Moscow Mayor's Office has approved the fifth list of self-constructed objects to be dismantled. For the first time, the city government ordered the dismantling of 104 pavilions and kiosks in December 2015. The first wave of demolition of these facilities began on the night of February 9, 2016.

“The fifth list of unauthorized construction sites includes 78 sites with a total area of ​​42,308.8 sq. m, ”said on Tuesday, August 22, the press service of the State Inspectorate for Control over the Use of Real Estate in Moscow. The entire samostroy to be dismantled is located on utilities, as well as in areas with a special mode of use, including in the security zone of linear metro facilities and the road network.

The three properties to be demolished are located in the center of Moscow. These are two buildings on Novy Arbat (building 8, building 2 and building 24, building 2), where popular restaurants are located. Including the Thai cafe "Na Voke" (the site already has an announcement about the closure "due to the end of the lease") and the English pub "Molly Gwinns". Also on the list was a building on Kaluzhskaya Square near the Oktyabrskaya metro station. According to the Moscow Mayor's Office, these three facilities were erected without permits and are located in the protected areas of linear facilities, communication networks, power grid facilities, water disposal and heating networks.

The largest objects of unauthorized construction, which were included in the list for demolition during the fifth wave, turned out to be a non-residential building with an area of ​​6,700 square meters. m on Simferopol Boulevard and a number of buildings with a total area of ​​over 1000 sq. m on Ryazansky Prospekt. It is also planned to demolish illegal buildings near the Tsaritsyno, Kantemirovskaya, Domodedovskaya, Skhodnenskaya and Kuzminki metro stations.

The fifth list of self-building for demolition in Moscow. Map

Several real estate objects will be dismantled near the Vykhino and Volgogradsky Prospekt metro stations.

The mayor's office explained that these objects have turned from temporary into permanent ones in the absence of permission and are located in the buffer zone of linear objects. A samostroy area of ​​429.6 square meters. m on Bochkova Street near the Alekseevskaya metro station was built on the sidewalk right next to a residential building, which causes dissatisfaction among residents. The demolished object on Altufievskoye Highway was built in the underbridge space. And the cafe "Night Rendezvous" intended for demolition on Velozavodskaya Street is illegally located in the security zone of gas supply networks.

The Moscow Mayor's Office informed that within seven days from the date of the adoption of the decision, the State Inspectorate for Real Estate will send notifications to the owners of these structures about the need to dismantle them. For the voluntary demolition of unauthorized construction, compensation is provided in the amount of 55,500 rubles per 1 sq. km. m, if the object is dismantled on its own, and 51,000 rubles per 1 sq. m, if it is dismantled with the help of prefectures of administrative districts.

Objects of unauthorized construction, not demolished voluntarily, will be dismantled by force.

The Moscow government assured that in the territories that are freed from illegal buildings, new objects will not appear - they will all be landscaped.

In just a year and a half - from February 2015 to the present - more than 3,000 illegal unauthorized construction sites were dismantled in Moscow.

Wave after wave

On the night of February 9, the so-called night of long buckets took place in the capital - the Moscow authorities began to demolish the first 97 shopping pavilions, which were included in the list of 104 dangerous unauthorized buildings located in different parts of the city. The decision to demolish them was made in December 2015. On February 8, the period allotted for independent dismantling expired, none of the property owners agreed to voluntary demolition. And the Moscow mayor's office independently began to dismantle buildings and kiosks.

Subsequently, the owners of the demolished objects filed a lawsuit with the Supreme Court, but lost - the court recognized the demolition as legal. Nevertheless, property owners continued to file lawsuits against the Moscow authorities in various courts. On June 29, 2016, the head of the State Inspectorate for Real Estate in Moscow, Sergei Shogurov, announced that the Moscow City Hall had won 98 lawsuits filed by the owners of the demolished squatter buildings.

On June 28, 2016, Moscow Mayor Sergei Sobyanin announced a new list of 107 unauthorized buildings with a total area of ​​31,000 sq. m to be demolished. Most of these facilities were located in the South Administrative District, the Central Administrative District, the South-Western Administrative District and the East Administrative District. In October 2016, the Moscow authorities published a new list of 43 self-construction sites that will be demolished. All of them were erected in zones with special regimes for the use of territories, including above water supply and under power lines, above heating mains and at the entrances to metro stations. The total area of ​​43 objects is 26,700 sq. m. Most of them were located at the metro station "Petrovsko-Razumovskaya". Six more objects were located in the Central Administrative District and North-West Administrative District, 5 objects - in the North-Eastern Administrative District, 4 - in the Eastern Administrative District, 3 - in the South Administrative District, 2 - in the South-Eastern Administrative District, and one object each - in the South-Western Administrative District and ZAO.

In December 2016, a list of the fourth wave of squatter demolition was published. It included 54 objects. Their demolition began in February 2017. The owners of three-quarters of the fourth wave of unauthorized construction sites “expressed their readiness to dismantle them on a voluntary basis.

Videos market demolition

Are you having trouble finding a specific video? Then this page will help you find the movie you need. We will easily process your requests and give you all the results. No matter what you are interested in and what you are looking for, we will easily find the necessary video, no matter what direction it would be.

If you are interested in modern news, we are ready to offer you the most current news reports in all directions. The results of football matches, political events or global, global problems. You will always be aware of all the events, if you use our wonderful search. The awareness of the videos we provide and their quality depends not on us, but on those who flooded them into the Internet. We just supply you with what you seek and require. In any case, using our search, you will know all the news in the world.

However, the world economy is also quite an interesting topic, which worries very many. A lot of things depend on the economic state of different countries.

What objects are being dismantled in the fifth wave of demolition of squatters in Moscow. List 

For example, import and export, any food or technology. The same standard of living directly depends on the state of the country, as well as wages and so on. What can be useful for this information? It will help you not only to adapt to the consequences, but also to warn against a trip to this or that country. If you are an avid traveler, then make sure to use our search.

Today it is very difficult to understand political intrigues and to understand the situation you need to find and compare a lot of different information. Therefore, we will easily find for you various speeches of the deputies of the State Duma and their statements for all the past years. You can easily understand the politics and the situation in the political arena. The policy of different countries will become clear to you and you can easily prepare yourself for the coming changes or adapt already in our realities.

However, you can find here not only various news from around the world. You can also easily find yourself a film, which will be nice to watch in the evening with a bottle of beer or popcorn. In our search database there are films for every taste and color, you can easily find an interesting picture for yourself without any problems. We can easily find for you even the oldest and hard-to-find works, as well as the classics known to all - for example Star Wars: The Empire Strikes Back.

If you just want to rest a bit and are looking for funny videos, then we can quench your thirst. We will find for you a million different entertainment videos from around the planet. Short jokes easily lift your spirits and another day will cheer you up. Using a convenient search system, you can find exactly what will make you laugh.

As you already understood, we work tirelessly, that you would always receive exactly what you need. We created this wonderful search specifically for you, that you could find the necessary information in the form of a video clip and watch it on a convenient player.

Today, the city authorities published a new list of objects that are recognized as self-construction and are subject to demolition. The document contains a list of 107 illegal buildings located in almost all districts of Moscow, most of which are located in metro security zones. The State Inspectorate says that the dismantling can begin in two months.

Back in February, when illegal trade pavilions were being demolished in Moscow, the city authorities promised: this is not the end. And now the city hall presented a new list.

“Today we are making a decision to demolish a number of buildings. The city continues to free itself from dangerous squatting. It's about about objects located on engineering communications, on the road network, in the security zone of the subway. I ask you to bring today's decision to the owners of the facilities, to assist tenants in finding new retail space, especially since there is no shortage of them in the city - today more than three million square meters of trade are not occupied, ”Sergey Sobyanin said.

The new list includes 107 objects in different districts of Moscow, from the center to the outskirts. Two trade pavilions will be demolished on Zubovsky Boulevard at once - one occupies most sidewalk, the other practically closes the exit from the Park Kultury metro station.

The same thing at Skhodnenskaya - at the exit from the subway. Interfere with pedestrians, according to the Moscow authorities, and shops on Shabolovka. There will soon be no shopping center on Bolshaya Semyonovskaya with an area of ​​​​more than two thousand square meters. As it turned out, the owners had permission only for non-capital construction.

In line for demolition are small shops on Volgogradsky Prospekt and on Marshal Chuikov Street. But on Varshavka - the reconstruction is much larger. An entire spontaneous trading town is being liquidated near the Nagatinsky market. A few more objects will be demolished on Kirovogradskaya Street. Owners and tenants will receive notifications in the next seven days - demolition will begin at the end of August. So there will be time for preparation, and many are already looking for new areas.

“We estimate that no more than 10 of our stores will be included in the list. We work with a large number of landlords in Moscow, and I think that it will not take us so long to find a suitable rotation for new premises,” said Alexei Ukolov, director of real estate and development of the network of communication stores.

For large tenants, of course, it is easier, and the February experience will also come in handy. But in small retail outlets while at a loss. The shopping center on the Olympic is also on the list. Nothing is known about the upcoming move here.

“It seems that we do not interfere with anyone, on the contrary, the people are satisfied, cleanliness and order are everywhere. We want to keep working, the store has been standing for 20 years already,” says an employee of the store.

Buyers are not yet ready for change either. “There are few places like this around here. Well, it's the only one on this avenue,” complains the buyer.

However, local residents admit that this pavilion obviously does not add beauty to the Olympic Avenue, and the closer to the center, the more noticeable. The lobby of the Kropotkinskaya metro station was partially vacated back in February from the stores that closed it. The rest of the buildings were included in the new list, so the view will change a lot in the fall. The square in front of Ulitsa 1905 Goda metro station will also be transformed - there will be no more shopping pavilions here. How the appearance of the city is changing at the same time, many noticed back in February, then appreciated it in the summer. For example, Sukharevskaya Square is now, indeed, unrecognizable.

"Sukharevskaya Square has become wider, more attractive, freer, more pleasant to look at," says a passer-by.

“True, there was a homeless person here, but now it has become much better and more pleasant to look at all this, breathing has become better here,” another passer-by confirms.

Owners of illegal buildings will be offered to demolish voluntarily. So it was last time. Those who refuse will be helped by the city.

Address

demolition area

Olympic prospect, 10, building 7

Security zones of power grid facilities

(Prechistensky gates sq., vl.1, building 2)

Protective zones of networks and structures of the centralized sewerage system. Protective zones of the domestic drinking water supply system

Prechistensky Gate Square, 1

(Prechistensky gates sq., vl.1, building 4)

Protective zones of linear objects. Protective zones of the domestic drinking water supply system

Prechistensky Gate Square, 1

(Prechistensky gates sq., vl.1, building 6)

Prechistensky Val, 1/2

(St. Prechistensky Val, 1/2, building 2)

Security zones of electric grid facilities. Protective zones of linear objects

Prechistensky Val, 1/2

(St. Prechistensky Val, 1/2, building 3)

Security zones of electric grid facilities. Protective zones of networks and structures of the centralized sewerage system.

st. 1905, d. 4

(str. 1905, d. 4 building 2)

Zone of protection of communal heating networks. Protective zones of networks and structures of the centralized sewerage system. Protective zones of linear objects

sh. Zvenigorodskoe d. 1 (sh. Zvenigorodskoe d. 1)

Common areas

st. Sadovo-Sukharevskaya, 8/12, building 6

Protective zones of the drinking domestic water supply system. Security zones of communication networks, communication facilities.

st. Koroviy Val, d. 1, building. 2A

Zubovsky boulevard, 5, building 3

Security zones of communication networks, communication facilities. Protective zones of linear objects. Protective zones of networks and structures of the centralized sewerage system.

Zubovsky Boulevard, 35 (Zubovsky Boulevard, 35 building 4)

Common areas. Protective zones of networks and structures of the centralized sewerage system. Security zones of communication networks, communication facilities. Security zones of electric grid facilities

Rifle per. d. 1

Common areas. Security zones of power grid facilities

emb. Semenovskaya, d. VL. 3/1, page 17

Protective zones of linear objects

Northern administrative district

Address

demolition area

Leningradsky prospect, 27

(Leningradsky prospect, 27, building 6)

Common areas. Protective zones of networks and structures of the centralized sewerage system.

Leningradsky prospect, 27

(Leningradsky prospect, 27, building 7)

Common areas. Protective zones of networks and structures of the centralized sewerage system. Protective zones of the domestic drinking water supply system

Leningradsky prospect, 48/2 building 10

Security zones of gas supply system facilities. Security zones of networks and structures of the centralized sewerage system

Leningradskoe shosse, 9

(Leningradskoe shosse, 9/4)

Common areas.

Korovinskoe highway, vld., 33A

Common areas. Protective zones of networks and structures of the centralized sewerage system.

Eastern administrative district

Address

demolition area

st. Bolshaya Semenovskaya, d.VL. 15A, p. 1
st. Pervomaiskaya, 77, building 3

Common areas

st. Pervomaiskaya, 77, building 4
st. Pervomaiskaya, 77, building 5

Common areas. Protective zones of drinking and domestic water supply systems

st. Pervomaiskaya, 73, building 6

Common areas. Protective zones of linear objects

st. Pervomaiskaya, 73, building 7

Common areas. Protective zones of linear objects

st. Uralskaya, d. VL. 4B, p. 1

Security zones of electric grid facilities. Security zones of networks and structures of the centralized sewerage system

st. Bolshaya Semenovskaya, 26, building 2 Security zones of electric grid facilities. Security zones of communication networks, communication facilities.

st. Bolshaya Semenovskaya, 26

(Bolshaya Semenovskaya st., 26, building 7)

Security zones of electric grid facilities. Protective zones of linear objects

Izmailovsky prospect, 63

(Izmailovsky prospect, 63, building 2)

Common areas.

st. 2nd Vladimirskaya, 36A

(st. 2nd Vladimirskaya, 36A, building 1)

Svobodny prospect, 22, building 1

Common areas.

Green Avenue, 57G

Common areas. Protective zones of linear objects

st. Krasny Kazanets, 18

(street Krasny Kazanets d. VL. 18)

st. Sovetskaya, d. 80, building 5

Security zones of networks and structures of the centralized sewerage system

st. Sovetskaya, d. 80, building 6

Security zones of networks and structures of the centralized sewerage system

st. Sovetskaya, d. 80, building 7

Security zones of networks and structures of the centralized sewerage system

st. Sovetskaya, d. 80, building 8

Security zones of networks and structures of the centralized sewerage system

st. Kuskovskaya, 12

Western administrative district

Address

demolition area

Bagrationovsky passage. d. 2A

Common areas. Protective zones of linear objects

Kutuzovsky prospect, 71-1/1, building 1

Common areas. Zone of protection of communal heating networks

st. Malaya Filevskaya, 58, building 1

Zone of protection of communal heating networks. Security zones of gas supply system facilities

Prospect Vernadsky, 39A

Common areas. Protective zones of linear objects

Prospect Vernadsky, 39B

Common areas. Protective zones of linear objects. Security zones of communication networks, communication facilities

Moscow Ring Road, 51st km, 1

Common areas. Protective zones of networks and structures of the centralized sewerage system.

Michurinsky prospect, 45A

Common areas. Protective zones of linear objects

st. Ramenki, d. 5A Security objects of the electric grid economy.
st. Ramenki, d. 5B Protective zones of the drinking domestic water supply system. Zone of protection of communal heating networks

Southern Administrative District

Address

demolition area

st. Shabolovka, 30, building 2

Common areas

2nd Kozhevnichesky per. ow. 1 A

Common areas. Security zones of electric grid facilities. Security zones of networks and structures of the centralized sewerage system

Warsaw highway, vl. 32 building 1

Common areas

Warsaw highway, vl. 32 building 1, building 3

Zone of protection of communal heating networks

Warsaw highway, vl. 32 building 1, building 4

Protective zones of the drinking domestic water supply system. Common areas

Warsaw highway, vl. 32 building 1, building 5

Common areas. Security zones of gas supply system facilities. Protective zones of the domestic drinking water supply system

Warsaw highway, vl. 32 building 1, building 6

Common areas. Protective zones of linear objects. Security zones of gas supply system facilities. Security zones of electric grid facilities. Security zones of networks and structures of the centralized sewerage system

Warsaw highway, vl. 32 building 1, building 7 Common areas. Protective zones of linear objects. Security zones of networks and structures of the centralized sewerage system
Warsaw highway, vl. 32 building 1, building 8 Security zones of electric grid facilities. Protective zones of linear objects. Security zones of networks and structures of the centralized sewerage system
Warsaw highway, vl. 32 building 1, building 9 Common areas.
Warsaw highway, vl. 32 building 1, building 10 Security zones of gas supply system facilities. Protective zones of the domestic drinking water supply system
Warsaw highway, vl. 32 building 1, building 11 Security zones of gas supply system facilities. Protective zones of the domestic drinking water supply system
Warsaw highway, vl. 32 building 1, building 12 Protective zones of linear objects

st. Kirovogradskaya, d.VL.9, bldg. 2B

(St. Kirovogradskaya, vld. 9, building 1, B/N room 2)

Security zones of communication networks, communications. Protective zones of linear objects
st. Kirovogradskaya, d.VL.9, bldg. 2G Protective zones of linear objects. Security zones of gas supply system facilities
st. Kirovogradskaya, d.VL.12B Common area
st. Kirovogradskaya, vld. 9, bldg. 4 A Protective zones of linear objects
Warsaw highway, d.VL. 135A Common area
Warsaw highway, d.VL. 135A, p. 2 Common area
Warsaw highway, d.VL. 135A, p. 3 Common area
Warsaw highway, d.VL. 135A, p. 4 Common area
st. Generala Belova, 33/19, building 2 Security zones of networks and structures of the centralized sewerage system
Prospekt Andropova, 21G Common area. Protective zones of linear objects

Northwestern Administrative Okrug

Northeastern Administrative Okrug

Address

demolition area

st. Kostromskaya, 19B

Common areas. Security zones of networks and structures of the centralized sewerage system

Yaroslavskoe shosse, 55, bldg. 1, built. one
st. Snezhnaya, 26B

Protective zones of linear objects

st. Butyrskaya, 6(3)

(St. Butyrskaya, 6, building 3, building 1)

Common areas

st. Butyrskaya, 86G

(St. Butyrskaya vld. 86G)

Protective zones of linear objects

st. Butyrskaya, vld. 84A

Common areas. Security zones of networks and structures of the centralized sewerage system

st. Butyrskaya, vld. 84B

Common areas. Security zones of networks and structures of the centralized sewerage system

st. Dekabristov, d. 17G

Common areas. Protective zones of networks and structures of the centralized sewerage system. Protective zones of linear objects

st. Pleshcheeva, d. 8G

Common areas. Protective zones of networks and structures of the centralized sewerage system. Protective zones of the domestic drinking water supply system

Southeastern Administrative Okrug

Address

demolition area

Entuziastov Highway, 22A

Protective zones of linear objects

Volgogradsky prospect, vld. 78A, p. 1
st. Marshal Chuikov, 2

Common areas. Security zones of drinking and domestic water supply systems. Protective zones of linear objects

Volzhsky boulevard, 54, building 1

Common areas. Protective zones of linear objects

Volzhsky boulevard, 54, building 2

Common areas. Security zones of drinking and domestic water supply systems. Protective zones of linear objects

Volzhsky boulevard, 54, building 4

Common areas. Protective zones of linear objects

Volzhsky boulevard, 54, building 5

Common areas. Protective zones of linear objects

Volzhsky boulevard, 54, building 6 Common areas. Protective zones of linear objects

Southwestern Administrative Okrug

Address

demolition area

Leninsky Prospekt, d.VL. 45-B, p.1
Leninsky Prospekt, d.VL. 45-B, p.2

Common areas. Protective zones of the domestic drinking water supply system

Building with an approximate area of ​​600 sq. m. in the northwestern part of the land plot of Novoyasenevsky Prospekt, vl. 2A, page 1

Protective zones of the drinking domestic water supply system. Zone of protection of communal heating networks

Building with an approximate area of ​​1000 sq. m. in the eastern part of the land plot of Novoyasenevsky Prospekt, vl. 2A, page 1

Protective zones of the drinking domestic water supply system. Zone of protection of communal heating networks

Novoyasenevsky prospect vl. 1, page 1

Specially protected natural area. Zone of protection of communal heating networks

st. Profsoyuznaya, 129, building 1

Protective zones of linear objects. Security zones of networks and structures of the centralized sewerage system

st. Profsoyuznaya, 150, building 2

Protective zones of linear objects.

st. Profsoyuznaya, 152, building 1 Protective zones of linear objects.
st. Trade union, vld. 154G, p. 2 Protective zones of networks and structures of the centralized sewerage system. Protective zones of the domestic drinking water supply system
st. Yushunskaya Malaya, d.VL. 1B page 1 Landscaping of the common area. Security zones of networks and structures of the centralized sewerage system
st. Yushunskaya Malaya, d.VL. 1B page 2 Common areas. Protective zones of networks and structures of the centralized sewerage system. Protective zones of linear objects
st. Yushunskaya Bolshaya, vld. 1, page 1 Common areas. Protective zones of linear objects
Nakhimovsky prospect, 9, building 1, building 1 Common areas. Protective zones of networks and structures of the centralized sewerage system. Security zones of gas supply system facilities
Nakhimovsky prospect, 9, building 1, building 2 Common areas. Protective zones of the drinking domestic water supply system. Security zones of gas supply system facilities
Nakhimovsky prospect, 9, building 1, building 3 Common areas. Protective zones of the drinking domestic water supply system. Protective zones of networks and structures of the centralized sewerage system. Security zones of gas supply system facilities
st. Azovskaya d.VL.3, building 1 Zone of protection of communal heating networks. Protective zones of linear objects.